Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 8 results ...

Birnie, J and Yates, A (1991) Cost prediction using decision/risk analysis methodologies. Construction Management and Economics, 9(02), 171-86.

Fellows, R F (1991) Escalation management: forecasting the effects of inflation on building projects. Construction Management and Economics, 9(02), 187-204.

Ibbs, W C (1991) Innovative contract incentive features for construction. Construction Management and Economics, 9(02), 157-69.

Khosrowshahi, F (1991) Simulation of expenditure patterns of construction projects. Construction Management and Economics, 9(02), 113-32.

Newton, S (1991) An agenda for cost modelling research. Construction Management and Economics, 9(02), 97-112.

Ogunlana, S O (1991) Learning from experience in design cost estimating. Construction Management and Economics, 9(02), 133-50.

Singh, S (1991) Cost estimation of prestressed concrete beam and reinforced concrete slab construction. Construction Management and Economics, 9(02), 205-15.

Srinivasan, R and Harris, F C (1991) Lane rental contracting. Construction Management and Economics, 9(02), 151-5.

  • Type: Journal Article
  • Keywords: highway; maintenance; road contract; tendering
  • ISBN/ISSN: 0144-6193
  • URL: https://doi.org/10.1080/01446199100000013
  • Abstract:

    This paper deals with the principal Lane rental systems operated in the UK and describes the merits and disadvantages of each. Issues relating to contractual arrangements, management style, contract finish times, working conditions and arrangements are covered. Comparisons are drawn with conventional contracts.